Pre Construction

  • In foundation pits we have to treat the bottom and the sides according to the height at the trench/pits
  • To refill the earth on both sides at all building up walls. (Approximate width 45 cms. and depth 45 cms.)
  • Before laying the floor, the entire leveled surface should be treated.
  • Outside the building area, also we have to make holes and inject the diluted termaticides, later on, the holes should be closed.

Quick Enquiry